Home
Articles
Events
Store
Sudbury Schools
Gallery
Contact Us
Internal
Construction and Building Pictures
Lounge to the Patio
Previous
Next
April 10, 2023
Picture of the patio location from the lounge.
Picture Thumbnails
Start of Clearing the Site
School Building Site
View of the Entrance
Starting to dig the Foundation
More Foundation
Preparing to Blast
After the Blasting
The Foundation after Blasting
Starting the Foundation
Starting the Foundation - 2
Starting the Foundation - 3
Building Footers
Lily and Lisa in the Foundation
Inside the Basement
Starting to Pour the Foundation
Two Trucks at Once
The Slump Test
Slump Test Results
Walls Finished, on to the Floor
Floor Just Poured
Lowering the Smoother
Handprints
Waterproofing the Basement
Support Beams
Floor Panels
The Floor is Partially Done
Floor is Done
Half the Frame is Done
The Back of the Building
The Front of the Building
The Trusses Ready Install
Placing one of the Trusses
More Trusses
Back of Building - Trusses Up
Start of the Roof
Dormer Closeup
The Completed Roof in Snow
The Front of the Building
The Back of the Building
The Exterior Trim Completed
The Building is Wrapped
Insulating the Walls
Insulation
The Main Hallway
Front of the Building with Trim
Kitchen Insulation
Kitchen Sheetrock
Kitchen Insulation - Other Angle
Kitchen Sheetrock - Other Angle
Kitchen Tile Being Installed
Kitchen Floor Mostly Done
Kitchen Floor Complete
Bathroom Hall
Bathroom Tiles
No More Porta Potty!
Den Entry
Lounge Entrance
Lounge Floor
Art Room
Building from the Parking Lot
Center of the Parking Circle
Building from the Entrance
Terrace and Tree Holes
The Hall
The Window Trim
Kitchen Trim
Door Frames
4 Levels of Moulding
Hallway/Lounge Before Paint
Hallway/Lounge Painted
Painting - Hallway to Kitchen
Stucco Buckets
Stucco Being Applied
Interior Door Stain
Lounge to the Patio
Patio Trees
Wall Sconce
Our own Road Sign
Paving Beast
Driveway Looking Up
Driveway Looking Down
Handicap Ramp and Porch
Building and Driveway
Copyright © 2004
Hudson Valley Sudbury School